Glossary
Solar and heating terms explained
The renewable energy world is full of acronyms and jargon. Here is a plain-English guide to the terms you will encounter.
Quick answer
Solar quotes use plenty of jargon. This glossary explains common terms such as kWp, inverter, DNO, G98, G99, MCS and the Smart Export Guarantee in plain English, so you can read a quote with confidence, compare options fairly and ask your installer partner the right questions before you decide anything.
Last updated: Reviewed by the Scottish Energy Efficiency team

- MCS
- Microgeneration Certification Scheme. The quality assurance standard for microgeneration installations. An MCS certificate proves your installation meets industry standards and is required for SEG payments.
- SEG
- Smart Export Guarantee. A UK government requirement for licensed electricity suppliers to offer payments to domestic customers for surplus renewable electricity exported to the grid. Rates vary by supplier — check current rates.
- DNO
- Distribution Network Operator. The company that owns and operates the electricity network in your area. In Scotland, SP Energy Networks covers central/southern Scotland and SSEN covers the north/Highlands/Islands.
- kWp
- Kilowatt peak. The maximum output of a solar panel system under standard test conditions. A 4kWp system has a peak output of 4 kilowatts, though real-world output varies with sunlight.
- kWh
- Kilowatt hour. A unit of energy. One kWh is the energy used by a 1,000-watt appliance running for one hour. Your electricity bill is measured in kWh.
- G98
- The DNO notification process for small-scale generators (up to 3.68kW per phase). Your installer notifies the DNO within 28 days of installation — no prior approval needed.
- G99
- The DNO application process for generators above 3.68kW per phase. Prior approval from the DNO is required before installation can proceed.
- EPC
- Energy Performance Certificate. A rating of a property’s energy efficiency from A (best) to G (worst). Required when selling or renting a property.
- PV
- Photovoltaic. The technology used in solar panels to convert sunlight into electricity. PV panels should not be confused with solar thermal panels, which heat water.
- Inverter
- The device that converts the direct current (DC) electricity generated by solar panels into alternating current (AC) electricity used in your home and the grid.
- Air source heat pump
- A heating system that extracts heat from outside air and compresses it to a temperature suitable for home heating and hot water. Runs on electricity.
- LiFePO4
- Lithium iron phosphate. A battery chemistry used in modern home batteries (Tesla Powerwall 3, Duracell Dura5, Pylontech US5000) known for safety, longevity, and thermal stability.
- Insurance-backed guarantee
- A guarantee that remains valid even if the installer ceases trading. Available through providers registered with TrustMark for consumer protection.
- TrustMark
- A government-endorsed quality standard for tradespeople. TrustMark-registered installers have been vetted for technical competence and customer service.
- Permitted development
- Building work that does not require planning permission. Most domestic solar installations in Scotland are permitted development, with exceptions for listed buildings and conservation areas.
- Building warrant
- The Scottish equivalent of building regulations approval. Required for certain building works, including some solar and heat pump installations. Applied for through eBuildingStandards.
Keep reading
What should you read next?
- FAQSolar FAQ Scotland | Solar Finance Scotland
- InsightsSolar Insights for Scotland | Solar Finance Scotland
- Solar PanelsSolar Panels Scotland | Survey and Written Quote
- Battery StorageHome Battery Storage Scotland | Add to Your Solar
- Air Source Heat PumpsAir Source Heat Pumps Scotland | Partner Installs
Ready when you are
How do I get a written, no-obligation quote for my home?
Tell us a little about your property and an MCS-certified installer partner will arrange a survey. Interest-free credit up to £30,000, subject to status.